PRE-CONSTRUCTION
- Planning & Design
- Constraints analysis
- Land use and lease mapping
- Surveying, staking, and plats
- Geotechnical/hazard evaluations
- Drilling and Completions Plans
- Permitting Services
- Environmental Impact Statements (EIS)
- Environmental Assessments (EA)
- Categorial Exclusions (CX)
- Plan of Operations (POO)
- Community involvement and public outreach
DRILLING
- Spill and Emergency Response Management
- Emergency Response Planning (ERP)
- Spill Prevention, Control, and Countermeasure (SPCC) Plans
- As-built surveying and mapping
- Spill response drills and training
- Natural Resource Damage Assessments (NRDA)
- Site investigation and remediation
- Post-drill water quality testing/reporting
PRODUCTION
- Oil and Gas Specific Permitting
- Federal and State APD packages
- Surface Use Plan of Operations
- Spacing orders and special exemptions
- Sundry Notices
- Air Quality
- Federal and State regulatory applicability analysis
- Federal and State Air Registrations/Permits
- Stack testing and reporting
- FID, PID, and gas testing and reporting
- Emissions inventories
- Chemical storage reporting (SARA Title III Tier II)
- Multimedia compliance audits
- Optical gas imaging – OOOOa FLIR
- Greenhouse gas screening and monitoring – Method 9 and Method 22
- Colorado Regulation 7 Compliance
- Leak Detection & Repair (LDAR) – Method 21
- Air Pollutant Emission Notice (APEN)
- AVO Inspections and Training
- Environmental Compliance and Monitoring
- Waste stream management
- Regulatory Evaluation
- Cultural Resources
- Biological Resource
- Water crossings / riparian habitats
- SWPP and Reclamation design / inspections
- Operational risk analyses
- Asset Acquisition Due Diligence
- NORM Surveys
- Spill and Emergency Response Management
- Emergency Response Planning (ERP)
- Spill Prevention, Control, and Countermeasure (SPCC) Plans
- Facility Response Plans (FRP)
- As-built surveying and mapping
- Spill response drills and training
- Natural Resource Damage Assessments (NRDA)
- Site investigation and remediation
CLOSURE
- Phase I and II Site Assessments
- Impacted Soil Removal/Disposal and On-Site Treatment
- Pit Closures/Remediation
- Sensitive Area Determinations
- NORM Surveys
- GroundwaterAssessment and Remediation
- Underground and Above-water Storage Tank Management
- Regional Hydrocarbon/Produced Water Impact Assessments
- Asset Retirement
- Facility closure and abandonment
- Decommission and demolition
- Site impact screening evaluations
- Sampling and reporting
- Agency Negotiations
DUE Diligence
- Transactional Services
- Environmental & Technical Due Diligence
- ASTM Phase 1 ESA’s
- Phase II Site Assessments
- Compliance liability assessments
- Operational liability assessments
- Health & Safety liability assessments
- Risk ranking and cost analyses
- Material issue corrective action planning
- NORM Surveys
Ryan Mueller | (979) 777-0115
RMUELLER@BLACKGOLDENV.COM
BLACKGOLDENV.COM