PRE-CONSTRUCTION

  • Planning & Design
    • Constraints analysis
    • Land use and lease mapping
    • Surveying, staking, and plats
    • Geotechnical/hazard evaluations
    • Drilling and Completions Plans
  • Permitting Services
    • Environmental Impact Statements (EIS)
    • Environmental Assessments (EA)
    • Categorial Exclusions (CX)
    • Plan of Operations (POO)
    • Community involvement and public outreach

DRILLING

  • Spill and Emergency Response Management
    • Emergency Response Planning (ERP)
    • Spill Prevention, Control, and Countermeasure (SPCC) Plans
    • As-built surveying and mapping
    • Spill response drills and training
    • Natural Resource Damage Assessments (NRDA)
    • Site investigation and remediation
  • Post-drill water quality testing/reporting

PRODUCTION

  • Oil and Gas Specific Permitting
    • Federal and State APD packages
    • Surface Use Plan of Operations
    • Spacing orders and special exemptions
    • Sundry Notices
  • Air Quality
    • Federal and State regulatory applicability analysis
    • Federal and State Air Registrations/Permits
    • Stack testing and reporting
    • FID, PID, and gas testing and reporting
    • Emissions inventories
    • Chemical storage reporting (SARA Title III Tier II)
    • Multimedia compliance audits
    • Optical gas imaging – OOOOa FLIR
    • Greenhouse gas screening and monitoring – Method 9 and Method 22
    • Colorado Regulation 7 Compliance
    • Leak Detection & Repair (LDAR) – Method 21
    • Air Pollutant Emission Notice (APEN)
    • AVO Inspections and Training
  • Environmental Compliance and Monitoring
    • Waste stream management
    • Regulatory Evaluation
    • Cultural Resources
    • Biological Resource
    • Water crossings / riparian habitats
    • SWPP and Reclamation design / inspections
    • Operational risk analyses
    • Asset Acquisition Due Diligence
    • NORM Surveys
  • Spill and Emergency Response Management
    • Emergency Response Planning (ERP)
    • Spill Prevention, Control, and Countermeasure (SPCC) Plans
    • Facility Response Plans (FRP)
    • As-built surveying and mapping
    • Spill response drills and training
    • Natural Resource Damage Assessments (NRDA)
    • Site investigation and remediation

CLOSURE

  • Phase I and II Site Assessments
  • Impacted Soil Removal/Disposal and On-Site Treatment
  • Pit Closures/Remediation
  • Sensitive Area Determinations
  • NORM Surveys
  • GroundwaterAssessment and Remediation
  • Underground and Above-water Storage Tank Management
  • Regional Hydrocarbon/Produced Water Impact Assessments
  • Asset Retirement 
    • Facility closure and abandonment
    • Decommission and demolition
    • Site impact screening evaluations
    • Sampling and reporting
  • Agency Negotiations 

 

DUE Diligence

  • Transactional Services
    • Environmental & Technical Due Diligence
    • ASTM Phase 1 ESA’s
    • Phase II Site Assessments
    • Compliance liability assessments
    • Operational liability assessments
    • Health & Safety liability assessments
    • Risk ranking and cost analyses
    • Material issue corrective action planning
    • NORM Surveys

Ryan Mueller   |  (979) 777-0115

RMUELLER@BLACKGOLDENV.COM

BLACKGOLDENV.COM